SH-8 Level One Concepts and Results

Rural Improvement Concept & Options

On-Alignment | ​Targeted roadway improvements outside of Moscow and Troy

Level One Result for Each Option: Carried Forward as an Element

Options may include:

  • ​Shoulder widening

  • Clear zone improvements

  • Passing lanes

  • Geometric improvements

  • Slow vehicle pull-out​

  • Intersection improvements

  • Turn lanes

  • Wildlife movement

  • Improved connection to Latah Trail

Graphic is for example purposes only to depict possible improvements.

Urban Improvement Concept & Options

On-Alignment | ​Targeted roadway improvements within Moscow and Troy
 

Level One Screening Results for Each Option: Carried Forward as an Element

Options may include:

  • Two-way left-turn lane

  • Five-lane cross section

  • Lane reallocation

  • Access management

  • Geometric improvements

  • Intersection improvements

  • Turn lanes

  • Improved connection to Latah Trail

  • Enhanced pedestrian crossing

  • Bike lanes on roadway

Graphic is for example purposes only to depict possible improvements.

New Corridor Concepts
Construction of new SH-8 highway alignment in rural area between Moscow and Troy with a consistent two-lane or four-lane cross section with shoulders and clear zone to current design standards. Other concepts, such as passing lanes, vehicle pullout areas, and turn lanes, would be installed with the new highway alignment to optimize traffic operations and safety.​

Graphics are for example purposes only to depict possible improvements.

Two-Lane Highway (Rural)

Four-Lane Divided Highway (Rural)

SH-8 New Corridor Concepts
New Alignments 

Level One Screening Results: Carried Forward

Map linework is intentionally oversized and drawn wide for potential new corridors. This allows our team to consider new alignments within a general area while we continue to gather data and community input.

SH-8 Re-Alignment to North - Concept 1

SH-8 Re-Alignment in Central Corridor - Concept 2

SH-8 Re-Alignment to South - Concept 3

SH-8 Re-Alignment South of Railway Corridor - Concept 5

SH-8 Re-Alignment to North - Concept 6

SH-8 Re-Design on Existing Alignment - Concept 7

SH-8 Re-Alignment to South Railway Corridor - Concept 4

Level One Result: Eliminated

Map linework is intentionally oversized and drawn wide for potential new corridors. 

SH-8 Re-Alignment to South Railway Corridor - Concept 4