Urban Improvement Concepts Carried Forward
Concept: Urban Improvements
Targeted Roadway Improvements in Moscow on the Current Highway Alignment
Option: Signal Operation Improvements
Level 2 Screening Result: Carried Forward
Key Components
Optimization of signal timing, including queue management and a review of the overnight flashing operation downtown, will be needed to recalibrate the network as part of any concept advanced out of Level 2 Screening, including the No Build option. Potential new traffic signal locations will be analyzed throughout the study process. New traffic signals may be warranted dependent on future traffic growth and other planning efforts.
Results
The Signal Operation Improvements Option was carried forward for refinement in Level 3.
Concept: Urban Improvements
Targeted Roadway Improvements in Moscow on the Current Highway Alignment
Option: Urban Walking and Bike Improvements
Level 2 Screening Result: Carried Forward
Key Components
Targeted improvements for walking and biking facilities would be considered for the current highway system.
Results
While the details of specific improvement elements could be identified and refined in Level 3, we anticipate considering options such as:
-
Improved Connection to the Latah Trail
-
Bike Lanes on the Roadway
-
Enhanced Pedestrian Crossing, including Mid-Block Crossing


Examples of a bike lane and crosswalk