top of page

Eliminated Concepts

Concept: Palouse River Drive

New Routes for Urban Mobility | 103 to 102

Level 2 Screening Result: Eliminated

Results

Palouse River Drive Concept as a standalone quadrant from 103 to 102 does not remove enough traffic from downtown Moscow to meet the Purpose & Need of this study. However, 103 to 102 appears in multiple top performing New Corridor Concepts and will proceed as a connecting element of those concepts.

US-95 PEL_Map_Urban Mobility_PalouseRiverDrive_March2026.png

Concept: New Route - A Street

New Routes for Urban Mobility

Level 2 Screening Result: Eliminated

Results

This concept does not remove enough traffic from downtown Moscow to meet the Purpose & Need of the study.

US-95 PEL_Map_Urban Mobility_A Street_Online.png

Concept: New Route - Styner Avenue

New Routes for Urban Mobility

Level 2 Screening Result: Eliminated

Results

This concept does not remove enough traffic from downtown Moscow to meet the Purpose & Need of the study.

US-95 PEL_Map_Urban Mobility_Styner Ave_Online.png

Concept: New Route - Urban Improvements

Targeted Roadway Improvements in Moscow on the Current Highway Alignment

Option: Access Management

Level 2 Screening Result: Eliminated

Results

This concept does not remove enough traffic from downtown Moscow to meet the Purpose & Need of the study.

US-95 PEL_Map-2_Urban Mobility_On-Alignment Access Mgmt_Oct 2024_Online.png

Concept: New Route - Urban Improvements

Targeted Roadway Improvements in Moscow on the Current Highway Alignment

Option: Lane Reallocations

Level 2 Screening Result: Eliminated

Results

This concept does not remove enough traffic from downtown Moscow to meet the Purpose & Need of the study.

US-95 PEL_Map-1_Urban Mobility_On-Alignment Lane Realloc_Oct 2024_Online.png
bottom of page