-01.png)
Urban Improvement
Urban Improvements Alternative:
Signal Operations
Targeted Roadway Improvements in Moscow on the Current Highway Alignment
Level 3 Screening Result: Carried Forward
Key Components
Optimization of signal timing, including queue management and a review of the overnight flashing operation downtown, will be needed to recalibrate the network as part of any concept advanced out of Level 3 Screening, including the No Build option. Potential new traffic signal locations will be analyzed throughout the study process. New traffic signals may be warranted depending on future traffic growth and other planning efforts.
Results: The Signal Operation Improvements Option is Carried Forward.

Urban Improvements Alternative:
Urban Walking and Biking Improvements
Targeted Roadway Improvements in Moscow on the Current Highway Alignment
Level 3 Screening Result: Carried Forward
Key Components
The study aims to not preclude facility improvements by others that are appropriate on the highway system.
Results: The Urban Walking and Biking Improvements Alternative is Carried Forward. Level 3 alternatives don’t preclude others to:
-
Improve connections to the Latah Trail
-
Consider bike lanes on the roadway
-
Enhance pedestrian crossing, including mid-block crossing

Walking and Biking Workshop in 2023
Economic Conditions
The alternative routes would reduce through traffic downtown while preserving access for shopping, services, and other economic activity. Planning-level screening did not identify significant adverse economic effects. A detailed analysis will follow during NEPA.
Key Takeaways:
-
Less through traffic
-
Continued downtown activity
-
Economic benefits and impacts will be evaluated during the upcoming NEPA environmental phase